Book a Test Drive
Partner login
Delivery Wait Index · 2026-07 edition

How long new cars really take in Australia

Nobody publishes systematic delivery-wait data for the Australian market — so we do. Our sourcing team works dealer allocations, cancelled orders and unclaimed builds every day; this index turns what we see into per-model wait windows, updated monthly.

ModelBody typeEstimated wait (as of 2026-07)Data statusNotes
Toyota LandCruiser Prado Large SUV (ladder-frame, 7 seats)~3–6 monthsEditorial seedHigh demand since the 2024 redesign; grade-dependent.
Toyota RAV4 Mid-size SUV~1–4 monthsEditorial seedHybrid AWD grades typically at the longer end; check monthly.
Ford Everest Large SUV (ladder-frame, 7 seats)~1–4 monthsEditorial seedV6 grades typically longer than bi-turbo.
Ford Ranger Dual-cab ute~1–3 monthsEditorial seedVaries sharply by variant and colour; V6 and Raptor typically longest.
Toyota HiLux Dual-cab uteUp to ~2 monthsEditorial seedGenerally available; SR5 and special editions vary.
Mitsubishi Outlander Mid-size SUVUp to ~2 monthsEditorial seedGenerally available; PHEV grades vary.
BYD Shark 6 Dual-cab ute (PHEV)Up to ~2 monthsEditorial seedShipments arrive in batches; availability moves month to month.
Hyundai Tucson Mid-size SUVUp to ~2 monthsEditorial seed
Kia Sportage Mid-size SUVUp to ~2 monthsEditorial seed
Tesla Model Y Mid-size SUV (BEV)Typically in stockEditorial seedTypically in stock or short local pipeline.
Mazda CX-5 Mid-size SUVTypically in stockEditorial seedGenerally in stock.
GWM Haval Jolion Small SUVTypically in stockEditorial seedGenerally in stock.

Methodology & citation

What the windows mean. Estimated time from placing a factory order to delivery for volume variants in mainland metro areas. Specific variants, colours and regions vary — sometimes sharply. "Typically in stock" means matching vehicles are usually available in the national dealer network without a factory order.

Where the data comes from. Book A Test Drive sources vehicles daily across a 200+ dealer network. Each edition compiles what our sourcing operations observed during the month, plus dealer-advised order ETAs. Entries are labelled: Observed means backed by our own sourcing outcomes that month; Editorial seed means our team's estimate while observed volume builds for that model. We publish the label rather than implying precision we don't have.

Citing this index. Free to cite with attribution and a link: "Book A Test Drive — Australian New Car Delivery Wait Index (2026-07)". Media and researchers can contact us for the underlying observations.

Why quoted waits aren't final. Cancelled orders and unclaimed dealer allocations surface constantly. Buyers regularly beat the quoted factory wait by months — finding those cars is our Skip the Queue service.

Don't want to wait?

Tell us the exact variant. We'll quote the real wait from live allocations — and hunt cancelled orders and unclaimed builds that could put you months ahead of the queue.